You are here: Home » Product List » 5Gallon Bottle Filling Line » 1200bph Barreled Production Line(QGF-1200)
1200bph Barreled Production Line(QGF-1200)
Product Description:It is the ideal equipment for mineral water, distilled water and purified water producing process. This machine composed with rinse filler and capper, Adopt cylinder cap press, with cap return function, cap sorter can keep one hour cap consummation, rinsing pressure will be displayed,
The main electrical parts adopt products with brand of SIEMENS and OMRON. Pneumatic parts adopt products with brand of AIRTAC. Both the inner and outer Shower nozzle for washing barrel adopts the special technology equipment from American Sprayer Company. The machine works reliably and efficiently based On the compact structure and high automatic technology. It is the fully automatic barreled water producing equipment combined with machine, electronic And pneumatic components. It is rotary type.
The main electrical parts adopt products with brand of SIEMENS and OMRON. Pneumatic parts adopt products with brand of AIRTAC. Both the inner and outer Shower nozzle for washing barrel adopts the special technology equipment from American Sprayer Company. The machine works reliably and efficiently based On the compact structure and high automatic technology. It is the fully automatic barreled water producing equipment combined with machine, electronic And pneumatic components. It is rotary type.
Trademark:KM
Technique parameter:
Rinsing Part:
|
Item |
Date |
|
Over size |
6000*2400*2200mm |
|
Power Heating |
18kw |
|
Power Other |
6kw |
|
Air consumption |
0.6m3/min |
|
Pressure |
0.6Mpa |
|
Material |
stainless steel 304 |
Filling and Sealing Part:
|
Item |
Date |
|
Over size |
3800*2400*2200 |
|
Power |
5kw |
|
Filling Head |
12head rotary working |
|
Sealing type |
Chain Press |
|
Capacity |
1200bph |
|
Speed adjutment |
Frequency adjustable |
|
Frame |
1.5-2mm SS304 |
Remark:Note that :
1,If customer request our technicians to install machines , so customer need pay 30USD/day ,air return ticketsroom and meals .
2,Guarantee period is 15monthes after machines received .
3,The capacity complete depend on the customer demands . We welcome customer to visit our company ! At any time , you will see the machine working and running in our factory !
1,If customer request our technicians to install machines , so customer need pay 30USD/day ,air return ticketsroom and meals .
2,Guarantee period is 15monthes after machines received .
3,The capacity complete depend on the customer demands . We welcome customer to visit our company ! At any time , you will see the machine working and running in our factory !














