© 2026 Zhangjiagang King Machine Co., Ltd. All rights reserved.Sitemap / Privacy Policy
Complete Bottled Water Production Line from A to Z
This video showcases King Machine's complete bottled water production line, demonstrating how to set up a bottled water factory and manufacture bottled water from A to Z.
The production process starts with PET preforms and caps, which can be purchased from suppliers or produced using injection molding machines. The PET preforms are then transformed into empty bottles by a bottle blowing machine, with the support of a water chiller and compressed air system.
The empty bottles are conveyed to the washing-filling-capping machine through an air conveyor system. The integrated machine performs bottle washing, water filling, and capping in a continuous process. After filling and sealing, the bottles undergo visual inspection to check for possible impurities.
The bottles then enter the labeling process. Depending on the packaging requirements, King Machine can provide OPP labeling machines, PVC shrink sleeve labeling machines, or adhesive labeling machines. Date coding is applied before the bottles proceed to the final packaging stage.
The finished bottled water products are packed using shrink wrapping machines or carton packaging equipment, then prepared for palletizing and distribution.
With extensive experience in PET packaging and beverage filling machinery, King Machine has supplied more than 1,000 water filling lines to customers in over 90 countries worldwide.
Watch this video to explore the complete bottled water manufacturing process, from bottle blowing and water filling to labeling and final packaging.
King Machine provides complete bottled water production line solutions and beverage packaging equipment for beverage manufacturers worldwide.
