Knowledge Graph  Equipment Maintenance

Whole-Machine Maintenance, Inspection &
Lubrication Specifications

Maintenance framework for blow molding machines: Includes every lubrication point, daily          start-up          and shutdown inspection procedures, as well as complete daily, weekly and monthly maintenance checklists
Updated on September 20, 2026  8 min read
  • 32Lubrication points

  • 5Daily inspections

  • 69Maintenance tasks

  • 3Maintenance cycles

Summary

All the intervals mentioned below are applicable under normal operating conditions. When the                  equipment is operating in harsh environments, these intervals should be shortened, and final plans                  must always be formulated based on the actual operating conditions of the equipment. Maintenance and                  repair work must be carried out by trained, qualified personnel who are familiar with this manual and                  relevant safety regulations.

  • Lubrication

    Every lubrication point of the blow moulding line, with the required medium, interval and                      application method.

  • Daily inspection

    The five mechanical checks that must be carried out before start-up and after shutdown.

  • Maintenance schedule

    69 cleaning, lubrication, inspection and fastening tasks classified by day, week and month.

 

XC8-00 Operation Manual - Maintenance & Lubrication

Download PDF · Chapter L · P123-P140 · 3 MB

 

Equipment Lubrication

Lubrication is the first line of defence of a blow moulding machine. The tables below list every                  lubrication point of the XC8 series machine with the required medium, the application method and the                  interval. 32 points in total, grouped by sub-assembly.

General rules for lubrication

  • During the first 1-2 months of operation, check whether the quality of the oil in the reducer                      has changed. If it has, find and eliminate the cause first, then replace the oil.

  • The oils and greases listed below are standard products for the specified environment and                      conditions. In a special environment, consult a professional lubrication supplier or a King                      Machine technician.

  • Do not mix two different lubricants unless it is approved by a King Machine technician or by the                      lubricant manufacturer.

  • Remove dirt before lubricating; wipe off any excess oil or grease afterwards and spread the                      grease evenly.

1 week
= 150 running hours
1 month
= 500 running hours
3 months
= 1,500 running hours
1 year
= 5,000 running hours
3 years
= 15,000 running hours

1.1 Heater

8 lubrication points on the preform heating oven - single-point lubricators, oil guns and brushes.

#Lubrication positionMethodOil / greasePeriod
1Heater top guide railSingle-point lubricatorMobil EP2Replace the lubricator every 6 months
2Heater rotary supporting roller wayOil gun, manualMobil EP2Every 160 hours
3Heater rotary supporting gear surfaceHairbrush, manualMobil EP2Every 72 hours
4Heater transmission bearing baseOil gun, manualMobil EP2Every 500 hours
5Heater inverting guide railSingle-point lubricatorMobil EP2Replace the lubricator every 6 months
6Heater small chain guide railHairbrush, manualMobil EP2Every 160 hours
7Heater dedusting guide railSingle-point lubricatorMobil EP2Replace the lubricator every 6 months
8Heater rear drive plateOil gun, manualMobil EP2Every 200 hours

1.2 Centralized lubrication system

One grease reservoir feeds the whole centralized lubrication circuit.

#Lubrication positionOil / greasePeriod
1Centralized lubrication systemShell Alvania EP2 greaseEvery 50 hours

1.3 Mould support unit

10 points on the mould frame. Food-grade grease is mandatory for all mould-area points.

#Lubrication positionOil / greasePeriod
AMiddle bearingFood-grade grease APEX FGL-21 week
BSwing-arm shaft bearingMobil EP21 week
CConnecting rod bearingMobil EP21 week
DPin bearingMobil EP21 week
GMold base railMobil EP21 week
HArea around the mold baseFood-grade grease APEX FGL-21 week
JMold locking pin 1Food-grade grease APEX FGL-21 week
KMold locking pin 2Food-grade grease APEX FGL-21 week
LShaft bearingFood-grade grease APEX FGL-21 week
MGuide shaftFood-grade grease APEX FGL-21 week

1.4 Preform infeed and discharge rails

4 high-frequency points on the preform handling rails.

#Lubrication positionOil / greasePeriod
APreform discharge railMobil EP2Every 48 hours
BHeating head chain sprocketMobil EP2Every 48 hours
CPreform infeed railMobil EP2Every 48 hours
DPreform pressing railMobil EP2Every 48 hours

1.5 Driving system

Reducer oil is changed by hours of operation; gears and the slewing support by weeks.

#Lubrication positionOil / greasePeriod
AReducerVG2201 year (see reducer manual)
BMain drive gearMobil EP23 weeks
CSlewing bearingMobil EP23 weeks

1.6 Mechanical arm

Linear guide rail of the transfer arm.

#Lubrication positionOil / greasePeriodMethod
1Mechanical arm linear guide railMobil EP2Every 140 hoursOil gun, manual

1.7 Encoder

Gear surface of the encoder - brush application, no excess grease.

#Lubrication positionOil / greasePeriodMethod
1Encoder gear surfaceMobil EP2Every 200 hoursHairbrush, manual

1.8 Mechanical seal guide rail

The shortest lubrication interval on the machine.

#Lubrication positionOil / greasePeriod
AMechanical seal guide railMobil EP2Every 24 hours

1.9 Stretch rail

Stretching rail running surface.

#Lubrication positionOil / greasePeriod
AStretch railMobil EP22 weeks

1.10 Left and right cam

Preform infeed cam and bottle discharge cam.

#Lubrication positionOil / greasePeriod
APreform infeed camMobil EP21 week
BBottle discharge camMobil EP21 week

Daily Inspection & Cleaning

Five mechanical checks to be carried out every day. Work on the machine only when it is stopped and                  locked out; keep the records of every measured value so that wear trends can be followed over                  time.

2.1 Mold opening / closing swing arm position

  1. Raise (mount) the guide rail of the swing-arm positioning device, inch the machine until the                      swing-arm bearing reaches the arc section of the rail. The bearing must pass tangentially along                      the rail. If it deviates, loosen the screws of the swing-arm expansion sleeve so the bearing runs                      tangent to the positioning rail, then tighten the locking screws diagonally.

  2. If mold closing is abnormally unsmooth during operation, keep an appropriate clearance between                      the rail and the bearing, measure it with a feeler gauge and keep a record of the value.

2.2 Mold equal height

  1. Inch the machine and check the equal height of the mold neck plate with a dial indicator - it                      must be adjusted within 0.1 mm.

  2. If the deviation is serious, loosen the set screws (three in total) on the adjusting nut at the                      lower end of the mold frame spindle, then turn the adjusting sleeve on the upper end of the nut                      with a wrench: clockwise lowers the mold frame, counter-clockwise raises it.

2.3 Bottom mold bearing equal height

  1. In the mold-locked state, press the bottom mold to its lowest position and set the clearance                      between the limit screw and the mold frame to 0.1 mm, so the bottom mold keeps the correct height                      in the mold slot.

  2. Check the equal height of the bottom mold bearings. If there is a deviation, add or remove                      adjusting shims between the bottom mold and the support frame.

2.4 Bottom mold rail and bearing clearance

  1. Inch the machine until the bottom mold bearing reaches about 20-250 mm along the bottom mold                      rail, then adjust the rail so the clearance between rail and bearing is 0.05-0.1 mm.

  2. At the outlet at the end of the rail, the bearing-to-rail clearance must be no less than 0.2 mm.

  3. The bottom mold rail has two fixing seats - adjust the rail height with the screws and set                      screws on the rail seats.

2.5 Sealing head to mold top plane clearance

  1. When the bearing moves to the topmost plane of the rail, check with a caliper that the clearance                      between the sealing head and the mold top plane is 24-25 mm.

  2. If it deviates, adjust the screws that fix the mechanical sealing rail.

Maintenance Period & Content

The complete routine maintenance list of the XC8 series machine: 17 cleaning tasks, 20 lubrication                  tasks and 32 spot-inspection / fastening tasks. Determine and implement the actual plan according to                  the running condition of your machine.

No.PartStandardMethodToolDayWeekMonth
Cleaning
1Equipment surfaceNo dust, no oilCleanCloth✓
2Inner machineNo dust, no oil, no debrisCleanCloth✓
3MoldNo dirt in mold cavity or on surfaceCleanSoft cloth, detergent or anhydrous alcohol✓
4Heating headNo dust, no oilCleanSoft cloth, anhydrous alcohol✓
5Preform-in detecting electric eyeNo dust, no oilCleanSoft cloth✓
6Preform infrared temperature headNo dust, no oilCleanSoft cloth✓
7Heater infrared tubeNo dust on the surfaceCleanSoft cloth✓
8Heater reflectorNo dust on the surfaceCleanSoft cloth✓
9Heater cooling fan filterNo dust on the surfaceCleanSoft cloth, anhydrous alcohol✓
10Heater temperature detecting headNo dust on the surfaceCleanSoft cloth✓
11Heater cooling tunnelNo dust on the surfaceCleanSoft cloth✓
12Bottle / preform gripperNo PET debris, oil or dust on the surfaceCleanSoft cloth✓
13Brake systemSensitive brakingCleanCloth, anhydrous alcohol✓
14Distribution cabinetNo dustCleanCloth, compressed air✓
1540 bar high-pressure air filterNo dust, no oilCleanCloth, compressed air✓
16Cabinet air conditionerNo dustCleanWash or blow with compressed air✓
17Cooling water strainerNo dirtCleanWater rinse✓
Lubrication cont.
18Heater top guide railOne layer of oil film, no drippingMobil EP2Brush✓
19Heater loading / unloading railOne layer of oil film, no drippingUniversal 2# greaseBrush✓
20Heater small chain and drive gearOne layer of oil film, no drippingMobil EP2Brush✓
21Mandrel - large chain guideOne layer of oil film, no drippingMobil EP2Brush✓
22Mechanical arm linear bearings1 g / point / timeMobil EP0Oil gun✓
23Inner and outer rails of mechanical arm camOne layer of oil film, no drippingMobil EP2Centralized✓
24Mechanical seal guide rail linear bearings1 g / point / timeMobil EP0Oil gun✓
25Stretching rod railOne layer of oil film, no drippingMobil EP2Centralized✓
26Bottom mold linear bearings1 g / point / timeMobil EP0Oil gun✓
27Bottom mold railOne layer of oil film, no drippingMobil EP2Centralized✓
28Mold opening / locking railOne layer of oil film, no drippingMobil EP2Centralized✓
29Mold opening / closing railOne layer of oil film, no drippingMobil EP2Centralized✓
30Mold locking pin lockOne layer of oil film, no drippingMobil EP0Brush✓
31Bottom mold slot / mold positioning pinOne layer of oil film, no drippingFood-grade lubricating greaseBrush✓
32Mold spindle / swing arm shaftExtrude the old oilMobil EP2Oil gun✓
33Slewing supportExtrude the old oilMobil EP2Centralized✓
34Slewing gearOne layer of oil film, no drippingMobil EP2Brush✓
35Main drive gear bearingExtrude the old oilMobil EP2Oil gun✓
36Encoder gearOne layer of oil film, no drippingMobil EP2Brush✓
37Oil distributorRotating lubricationMobil EP2Oil gun✓
Spot inspection cont.
38Control air pressure6-7 barVisualEye✓
39Pre-blowing air pressure5-13 barVisualEye✓
40High-pressure blowing air28-40 barVisualEye✓
41Heater big chain gapGap not more than 0.5 mmFeeler gaugeFeeler gauge✓
42Mechanical armHorizontalVisualEye✓
43Sealing head moduleNo air leakage, no loosenessListen and feel by handEar, hand✓
44Stretching rod locking deviceNo loosenessFeel by handHand✓
45Stretching rod up / down limit bufferGood buffering, no damageFeel by handHand✓
46Stretching down limit deviceNo loosenessVisualEye✓
47Bottom mold up limit deviceNo looseness, 0.25-0.30 mmFeeler gaugeFeeler gauge✓
48Mold equal height0.1mmDial indicatorDial indicator✓
Spot inspection cont.
49Equal bearing height of mold opening / locking0.1mmDial indicatorDial indicator✓
50Gap between stretching bearing and guide rail0.2mmDial indicatorDial indicator✓
51Equal bearing height of bottom mold0.1mmDial indicatorDial indicator✓
52Alignment of mechanical arm and preform gripping tableCenteredFeel by handHand✓
53Alignment of mechanical arm and moldCenteredFeel by handHand✓
54Gap between stretching rod and bottom moldDown stretching pole to bottom mold 1.5-2mm;(Based on thickness of the preform injecti point)Feeler gaugeFeeler gauge✓
55Mold closing arm gap check0.1-0.15 mm between bearing and toolFeeler gaugeFeeler gauge✓
56Mold closing bufferGood buffering, no damageFeel by handHand✓
57Brake system2-3 molds moving after stopVisualEye✓
58Synchronous toothed beltModerate tension, no wearVisual and feelEye, hand✓
59Preform-in detecting electric eyeClean, sensitive and reliableVisualEye✓
60Each proximity switchClean, sensitive and reliableVisualEye✓
61Synchronization of the whole machineSynchronous, no misalignmentVisualEye✓
62Mechanical arm / stretching / bottom mold linear guide pairsFlexible actionFeel and visual、Hand, eye✓
63Stretch / bottom mold / mold opening-closing / opening-locking railsNo serious wear, no loosenessFeel and visual、Hand, eye✓
64Heating clampNo loosenessTighten with wrench13 / 19 mm open-end wrench✓
65Mold closing swing-arm boltNo loosenessTighten with wrench6# Allen wrench✓
66Stretching slide rail mounting boltsNo loosenessTighten with wrench5# Allen wrench✓
67Stretching rod locking deviceNo loosenessTighten with wrench4# Allen wrench✓
68Mechanical arm gripper screwNo looseness, gripper turns freelyTighten with wrench5# Allen wrench✓
69Preform loading / unloading guard plate boltsNo loosenessTighten with wrench6# Allen wrench✓

Need the maintenance plan for your own line?