Specification:
Voltage:220V 50HZ
Power:2KW
Max.packing size:420 280 350mm L W H
Package speed:17-25bags/min
Air source pressure:0.5-0.7Mpa
Equipped with infrared ray hot air circle shrink tunnel
Power:22KW
Conveyor speed:0-15m/min
Shrink tunnel size:2465 840 1700mm L W H
Note:the machines packing size and shrink tunnel is designed according customer requested speed and bottle size.
No | Model | BS-20 | BS-26 |
1 | Capacity | 12000bph 500ml | 15000bph 500ml |
2 | Gas requirement | 0.4 ~ 0.6Mpa | |
3 | Working pressure | 3PH 380V/50Hz, 42KW | |
4 | Air Pressure | 0.6~0.8Mpa (without oil without water) | |
5 | Air consumption | 80-100NL/min Pipe Joint Size: Φ10 | |
6 | Shrink chamber L×W×H | 1800×650×450(mm) | |
7 | Shrink temperature | 200℃~280℃ | |
8 | Packing Material | LDPE (dust & static electricity removed Width of film roll:≤600mm Thickness of film:0.06~0.10mm Diameter of film roll:≤350mm Film reel diameter: 76mm | |
9 | Working noise | ≤65dB | |
10 | Total weight | 4000kg | |
11 | Environment condition | 3-100 meters above sea level | |
12 | Environment temperature | 5℃-40 ℃ | |
13 | Environment Humidity | 30-80 % without condensation |
YCBS26C | TECHNIC | BRAND |
Servo Motor&Control System | B & R | |
PLC | AUSTRIA | B & R |
Touch-screen | AUSTRIA | B & R |
Transducer | FRANCE | SCHNEIDER |
Approach Switch | KOREA | AUTONICS |
Pneumatic Organ | GERMANY | FESTO |
Contactor | GERMANY | SIEMENS |
Button | SHANGHAI | TAYEE |
Press Adjust Device | TAIWAN | MINDMAN |
Air switch | CHINA | DELIXI |
Terminal | CHINA | TAYEE |
Intermediate Relay | FRANCE | SCHNEIDER |
Conveyor motor | GERMANY | SEW |
Nearly 15 years, King Machine has provided bottling & packing equipments of liquid solutions to companies all over the world, water bottling line, juice filling line, carbonated soft drinks turnkey project, oil and soda water bottling line and labeling and packing machinery. All your different requiremts King Machine can always offer you the most professional solutions and turnkey project.
Nearly 15 years, King Machine has provided bottling & packing equipments of liquid solutions to companies all over the world, water bottling line, juice filling line, carbonated soft drinks turnkey project, oil and soda water bottling line and labeling and packing machinery. King Machine offers complete filling and packaging solutions for beverage industry and excellent lifelong time service.
1.Standardized workshop of total 20,000 square meters.
2.Verification Certificates of equipments: ISO9001:2001; CE Certificate, SGS Certificate, BV Certificate, standard organisation of nigeria , cnca certificate, Logo trademark registration, etc.
3.The equipments will be tested and run for 24 hours before leaving the factory, to ensure the smooth working of water pipeline, and pneumatic, electrical and mechnical stability.
4.Sufficient stock of spare parts ensures the timely delivery and supply of spare parts.
5.The engineers are experienced. We can produce different products with different capacity and work out reasonable flow chart as per customers’ requirements to save space.
6.Professional installation team who can speak fluent English can help customers make benefits in a shortest time.
We control the quality of our equipments by manufacturing and machining ourselves. Pay attention to each assembly detail, and our experienced technicians monitor each key point efficiently during assembly, to ensure that the performance and appearance of each product be pefect.
To help our customers build an ideal factory. With efficient cost control, we have found the right balance with our customers: diversified production range, high-class packaging forms. Meanwhile market competitivness has been improved because of the efficient operation mode of equipments.
Q:How about the spare parts?
A:We will send one year enough easy broken spare parts together with the machines,shipping together.During the warranty time,we will supply the spare parts with our cost including the delivery fees.
Q:How long time for installation?
A:According your machines order,we will send one or two engineers to your plant,it will take about 10 days to 25 days.
Q:How to install my machines when it arrives?how much the cost?
A:We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation and USD80/day/person.
Q:When can I get my machine after I paid?
A:Normally production time is around 30-60days,the exactly depend on what kind of machine you order.The shipping time is based on your destination port.
Q:What’s your guarantee or the warranty of the quality if we buy your machines?
A:We offer you high quality machines with 1 year guarantee and supply life-long technical support.
Q:Are you a trading company or a manufacturer?
A:We are an Original Equipment Manufacturer so that we can provide you high quality machines in raeasonable price, Welcome to visit us.
By continuing to use the site you agree to our privacy policy Terms and Conditions.