Automatic Soda Carbonated Soft Drinks Bottling Machine Automatic Soda Carbonated Soft Drinks Bottling Machine

1.Less area, lower energy consumption and easy opration.
2. DCG24-24 bottling machine is 6000BPH
3. Automatic washing filling 2 in 1
4. SS304 stainless steel
5. SIEMENS programmed controller (PLC)
6. ISO9001, CE, SGS, BV, SONCAP

Quantity:
Share this:
  • Model: DCG 24-24
  • Brand: KM
  • Code: 8422301090
  • Product Description
  • Turnkey Project
  • Company Information
  • Our Customer
  • FAQ
Glass Bottle Carbonated Soft Drinks Filling Machine

Product Description:

1.DCG24-24 washing,filling  2in1 machine is mainly used in the isobaric pressure filling operations for the Carbonated drinks.
2.The two functions of bottle rinsing, filling are composed in one body of the machine. The whole process is automatic.
3.The machine is used in filling carbonated soft drinks, soda water, sparkling Water, energy drinks in glass bottles.
4.The advanced SIEMENS programmed controller (PLC)
5.The capacity of this machine is 6,000 bottles per hour, and we can also provide carbonated filling machine capacity in the range of 1000-32,000 bottles per hour.


Inside structure:

Bottling Line Video





















Nearly 15 years, King Machine has provided bottling & packing equipments  of liquid solutions to companies all over the world, water bottling line, juice filling line, carbonated soft drinks turnkey project, oil and soda water bottling line and labeling and packing machinery. All your different requiremts King Machine can always offer you the most professional solutions and turnkey project.

1.Standardized workshop of total 20,000 square meters.
2.Verification Certificates of equipments: ISO9001:2001; CE Certificate, SGS Certificate, BV Certificate, standard organisation of nigeria , cnca certificate, Logo trademark registration, etc.
3.The equipments will be tested and run for 24 hours before leaving the factory, to ensure the smooth working of water pipeline, and pneumatic, electrical and mechnical stability.
4.Sufficient stock of spare parts ensures the timely delivery and supply of spare parts.
5.The engineers are experienced. We can produce different products with different capacity and work out reasonable flow chart as per customers’ requirements to save space.
6.Professional installation team who can speak fluent English can help customers make benefits in a shortest time.



We control the quality of our equipments by manufacturing and machining ourselves. Pay attention to each assembly detail, and our experienced technicians monitor each key point efficiently during assembly, to ensure that the performance and appearance of each product be pefect.

To help our customers build an ideal factory. With efficient cost control, we have found the right balance with our customers: diversified production range, high-class packaging forms. Meanwhile market competitivness has been improved because of the efficient operation mode of equipments.

Q1: Do you have reference project?
A1: We have reference project in most countries,If we get the permission of the customer who has brought the machines from us ,we can tell you their contact imformation,you can go to vist their factory.
And you are always welcome to come to visit our company,and see the machine running in our factory,we can pick you up from the station near our city.
Contact our sales people you can get video of our reference running machine

Q2: Do you have agent and after-service stations?
A2: So far we have agent in Yemen,Nigeria,Dubai,India,Kenya,Dubai welcome to join us!

Q3: Do you provide customized service
A3: We can design the machines according your requirements(materil ,power,filling type,the kinds of the bottles,and so on),at the same time we will give you our professional suggestion,as you know,we have been in this industry for many years.

Q4: What's your guarantee or the warranty of the quality if we buy your machines?
A4: We offer you high quality machines with 1 year guarantee and supply life-long technical support.

Q5: How long time for installation?

A5: According your machines order,we will send one or two engineers to your plant,it will take about 10 days to 25 days.

×

Contact Us