You are here:Home » Products » Others » Bottle Washing Machine

Bottle Washing Machine Bottle Washing Machine

Quantity:
Share this:
  • Model: ZPC
  • Brand: KM
  • Product Description


1.Fast bottle washing speed

The bottle washing speed of this machine gets to 2000-8000 b/h, which can save more time and labor

2. High working efficiency

It uses the frequency conversion speed regulation, and you can adjust speed according to the production scheduling at any time.

3.Less water consumption

It has the flushing channel, which can save water.

4.Rinsing thoroughly

The time of washing and empting bottles is tightly controlled by shunt valve. The bottle is rinsed thoroughly, and there is no water after empting bottle.

5.Simple operation

It is fully automatic, and easy to regulate if any need.

6.Large range of application

It is suitable for a majority of regular bottles e×cept for some special shaped bottles.

7.High quality clamp

The high quality clamp ensures safe working and long time usage.

8.There is limited stoppers/restrainers on each part, and it can protect the machine whenever the machine stopps by failure.


Model

Technical   Parameter

Filling   Heads

Output

Main   Motor Power

Lifting   Motor Power

Bottle   Height

Bottle   Dia.

Water   Consumption

Dimension     

pcs

b/h

kw

kw

mm

mm

m3/h

mm

ZPC-12

12

2000

1.2

0.37

140-360

100

0.5

1400×1200×1800

ZPC -16

16

3000

1.5

0.37

0.7

1550×1430×1900

ZPC-18

18

5000

1.5

0.45

1.1

1650×1800×1900

ZPC -30

30

8000

2

0.5

2.1

2200×2000×210




Q:How about the spare parts?
A:We will send one year enough easy broken spare parts together with the machines,shipping together.During the warranty time,we will supply the spare parts with our cost including the delivery fees.
          
Q:How long time for installation?
A:According your machines order,we will send one or two engineers to your plant,it will take about 10 days to 25 days.
          
Q:How to install my machines when it arrives?how much the cost?
A:We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation and USD80/day/person.
          
Q:When can I get my machine after I paid?
A:Normally production time is around 30-60days,the exactly depend on what kind of machine you order.The shipping time is based on your destination port.
          
Q:What’s your guarantee or the warranty of the quality if we buy your machines?
A:We offer you high quality machines with 1 year guarantee and supply life-long technical support.
          
Q:Are you a trading company or a manufacturer?
A:We are an Original Equipment Manufacturer so that we can provide you high quality machines in raeasonable price, Welcome to visit us.
×

Contact Us

By continuing to use the site you agree to our privacy policy Terms and Conditions.

I agree