Engineer Xie Lei's trip to Somalia from King Machine
On November 22, 2018, Zhang Jiagang King machine engineer Xie Lei went to Eller to debug 12 heads water line. The commissioning took 45 days, the main reasons are: 1, the factory voltage is unstable, and the power supply is not enough, causing engineers to wait in Somalia for a long time. 2, Worker