Small Mineral Pure water bottling plant price
Automatic Washing Filling Capping Machine (3-in-1) CGF8-8-3 is mainly applied for the filling of beverage. Integrating with washing, filling and sealing, it realizes full automation in the whole process, suitable for polyester bottle and plastic bottle filling of mineral water and purified water. The bottle types applicable for various parts are easily, conveniently and rapidly adjustable. It adopts new micro-negative pressure filling, stable and reliable. Compared with the machines of the same specification, the benefit of this machine is larger.
Project name :Cost of pure water bottling machine | ||||||
Model | CG8-8-3 | CGF14-12-4 | CGF18-18-6 | CGF24-24-8 | CGF32-32-10 | CGF40-40-12 |
Capacity(500ml bottles) | 2000 | 3000-4000 | 6000-8000 | 8000-12000 | 13000-15000 | 16000-18000 |
Suitable bottle shapes | PET circular or square | |||||
Bottle diameter(mm) | Dia50-Dia115mm | |||||
Bottle height (mm) | 160-320mm | |||||
Compressor air pressure(Mpa) | 0.3-0.7Mpa | |||||
Washing meidum | Aseptic water | |||||
Rinsing pressure(Mpa) | >0.06Mpa<0.2Mpa | |||||
Application | Bottle water filling machine | |||||
Total power (KW) | 4.4 | 4.4 | 4.4 | 5.2 | 6.2 | 7.8 |
Overall dimensions(L*W) | 2.3*1.9 | 2.5*1.9 | 2.8*2.15 | 3.1*2.5 | 3.8*2.8 | 4.5*3.3 |
Height | 2.3m | 2.5m | 2.5m | 2.5m | 2.5m | 2.6m |
Weight(kg) | 2500kg | 3200kg | 4000kg | 4500kg | 6500kg | 8000kg |
Small water bottling plant price
![]() Washing heads. |
![]() Filling heads |
![]() Capping heads Main Features. Flow chart: (Pure water filling machine): A)Bottle production line PET Resin --Injection moulding machine -Botlte blowing machine --PET bottle B)Water treatment system Raw water--Pump--Silica sand filter--Carbon filter--Water softner--Reverse Osmosis -UV sterilizer-Ozone generator--Finished water tank C)Filling&Packing part Bottle unscrambler--Air conveyor--Washing,filling,capping 3in1 machine--Light checker--Blow dryer--Dater printer--Lableing machine --Packing machine -Stock |
![]() RO water treatment systemWe adopt different equipment to produce pure water, mineral water etc. The main equipment of RO Water Treatment Plant are silica sand filter, active carbon filter, sodium ion exchanger, hollow fiber, RO( reverse osmosis), UV sterilizer, precision filter, ozone generator, water tank etc. It can effectively get rid of muddy organic matter, iron, manganese etc, reduce the hardness of the water to make all specifications of the water quality fully meet the state fresh water standard of fresh drink water. |
![]() ·The bottle belt is synchronously tracked with the host or the upstream and downstream equipment, which are connected to control system. ·The bottle does not fall, does not jam, and does not block during the conveying process. ·According to the user's needs, the buffer platform can be set in front of the labeling machine (the buffering time is usually about 1-2 minutes). |
![]() Automatic labeling machine1.Hot melt glue labeling machine is widely used for different material of container . |
![]() PE film packaging machineAutomatic PE film heat shrink wrapping machine is suitable for wrapping of such products as pop top, mineral water , bottles. beer, drinks etc. Working with PE film shrink tunnel to pack the goods perfectly , the whole production process adopts the Germany advanced technics, and the main parts are imported from international famous companies. It consists of seven actuating motor, through cooperation with 7 actuating motor to form the product packed with plastic film and several bottles as a group out from the hot shrinking packing machine. |
Nearly 15 years, King Machine has provided bottling & packing equipments of liquid solutions to companies all over the world, water bottling line, juice filling line, carbonated soft drinks turnkey project, oil and soda water bottling line and labeling and packing machinery. King Machine offers complete filling and packaging solutions for beverage industry and excellent lifelong time service.
1.Standardized workshop of total 20,000 square meters.
2.Verification Certificates of equipments: ISO9001:2001; CE Certificate, SGS Certificate, BV Certificate, standard organisation of nigeria , cnca certificate, Logo trademark registration, etc.
3.The equipments will be tested and run for 24 hours before leaving the factory, to ensure the smooth working of water pipeline, and pneumatic, electrical and mechnical stability.
4.Sufficient stock of spare parts ensures the timely delivery and supply of spare parts.
5.The engineers are experienced. We can produce different products with different capacity and work out reasonable flow chart as per customers’ requirements to save space.
6.Professional installation team who can speak fluent English can help customers make benefits in a shortest time.
We control the quality of our equipments by manufacturing and machining ourselves. Pay attention to each assembly detail, and our experienced technicians monitor each key point efficiently during assembly, to ensure that the performance and appearance of each product be pefect.
To help our customers build an ideal factory. With efficient cost control, we have found the right balance with our customers: diversified production range, high-class packaging forms. Meanwhile market competitivness has been improved because of the efficient operation mode of equipments.
By continuing to use the site you agree to our privacy policy Terms and Conditions.